Overview:
The flow blocker assembly is installed at the bottom of the toolhead, used to switch the position of the flow blocker plate and simultaneously control the elevation of the right auxiliary hotend.
Installation:
Please learn about the installation on Bambu Lab Wiki.
In the Box:
- Flow Blocker Assembly *1;
- BT3x9.5 Screw *3
Compatibility:
X2D
Bambu Lab - Flow Blocker Assembly (X2D)
SKU: FAC208
$14.99Price
Excluding Sales Tax


.png)
.png)





